Kwun Tong push 3 commercial to provide more than 3 million feet of floor

Kwun Tong is an important part of the development of Kowloon East. The new commercial flats in the future will supply 7.5 million square feet. The three commercial sites will be launched in Kwun Tong Center and Kwun Tong Action Area. More than 3 million square Foot floor.

Formerly Kwun Tong, which is formerly a traditional industrial area, has been transformed into a second core business district along with the Government, together with Kowloon Bay and Kai Tak, to launch the Kowloon East project. After the past few years, Into the commercial district, the region still has seven large commercial projects in the future supply, providing a total of 74.43 million square feet of floor.

Kwun Tong Town Center Area 4 Landmark Building

There are still three commercial projects to be launched, involving a total of 3.393 million square feet of commercial floor, with the largest number of commercial projects in District 4 and District 5 of the Kwun Tong Town Center redevelopment project planned for 20 years. Up to 2,025,000 square feet of office, retail and hotel floor.

The project, which is adjacent to the Kwun Tong MTR station, is in the heart of the urban area and covers an area of nearly 200,000 square feet. The fourth district, which has completed the acquisition, will develop into a building about 60 floors, with retail, office and hotel Of the landmark building, including the base part of the 9-storey retail mall, the highest 18-storey floor for a total of 18 layers of hotel use, providing about 400 rooms, the middle of the 32-storey floor for the office, the total floor of 1.45 million square feet The

As for the fifth district of Yu Man Square, will be the development of pure shopping malls, but because part of the commercial floor for the use of District 4, I believe the size of the entire shopping malls will be 1.0 million square feet than the original program has been reduced, but still Is one of the largest retail stores in the region.

Kwun Tong Pier Bus Terminus for commercial use

In addition, the Government has increased the supply of commercial flats in Kwun Tong and has also resettled the Government premises near Kwun Tong Pier to the Kwun Tong Action Area, which is now part of the Bus Terminus and Kwun Tong Pier Plaza for a total of about 130 000 square feet of land Will be designated as a “commercial” use, will be added platform and built on the cover of commercial buildings and recreational facilities.

The Kwun Tong Action Area will submit two development programs, of which Scheme One will be developed at 7.4 times the plot rate. Three commercial buildings will be built on the platform, providing 703,000 sq ft of office space and 156,000 sq. Ft. Retail and dining floors, together with creative cultural facilities and public transport interchanges, the gross floor is about 968,000 square feet.

As for another program called “interconnected space”, a larger platform will be built, while the commercial buildings on the cover will be reduced from 3 to 2, but the size of each building will be increased, each building Height of about 100 meters, office and retail and dining floor of about 860,000 square feet.

At the same time, the Government has also expanded the commercial land of Cha Kwo Ling Road in Kwun Tong by land exchange and built Tsui Ping River Park. The commercial area of 104,000 square feet, can be built about 123.8 million square feet, is expected to be available in the fastest 2018 to 19 years.

Facebook
Whataspp:(+852) 93088085